CRUDE OIL PIPELINE TRANSPORTATION AND STORAGE HANDLING
CRUDE
OIL PIPELINE TRANSPORTATION AND STORAGE HANDLING
April, 28th – 30th 2014 – Tentrem Hotel Yogyakarta
Background
Crude Oil is produced from
the reservoirs pass through well head at the surface and then collected at the
Block Station for separation of Oil, Gas and Water.
After from Block Station or
Gathering Station Crude Oil will be transferred by pipe line to the Mine Oil
Storage or Terminal. At the Mine Oil Storage or Terminal production from all
field collected together then transferred to Refinery, Domestic or Export.
The philosophy and
procedure for crude oil processing, transporting and storage handling are:
Safety, Minimized losses and pollutions, No changing the quality and avoid
contamination.
In the other hand many
companies carry out its product by joining with transporter, where has been
established the pipeline system for transfer to the refinery or Terminal.
This course is also
thoughtful study how to transfer crude oil joining with Pipeline Transporter,
cooperation with other companies in the Joining Pipeline Agreement.
Therefore this course will focus
to explain and discussed how to handling “Production
Operation”, “Crude Oil Pipe line Transportation”, “Crude Oil Storage”, “Lifting
Procedure”, “Off take Procedure and Nomination”.
After this course the
participant will be able to:
·
Carry out Production Operation at the Block Station.
·
Understanding of crude oil transportation by
pipeline.
·
As a duty at the Mine Oil Storage, Terminal.
·
To arrange and planning of Lifting and pumping schedule.
·
Understanding custody transfer meter, crude oil measuring
and calculation system.
This course is recommended
to the employees who are working at Block Station, Gathering Station, Pipeline
Operation, Mine Oil Storage and Crude Oil Terminal, Crude Oil Accounting and Member
of Shipping Coordination.
The Syllabus of this course consists of:
1.
Crude Oil Production Operation
Production collecting
system at the Block Station, Manifold and header, Block Station, Gathering
Station or satellite.
2.
Production Separation and Stabilization
Objectives of separation,
type and equipment inside Separator, Stabilities principle, Stabilizations with
reduced the pressure and stabilization with distillation type.
3.
Crude Oil Transportation by Pipe Line
Equipment of pipeline
system, Pumping, Combine Pumping, pumping type selection. Transportation of Low
Pour Point crude oil by heating or suspension system.
4.
Storage Handling, Lifting and Crude Oil Measurement
·
Crude oil storage type of storage tank and
accessories.
·
Procedure
measurement and calculation of crude oil in the storage tank (static
measurement) consist of: Level and temperature measurement of fluid in the
storage tank, Crude Oil Sample taking from inside the tank, Laboratory analysis
to determine of Density/Specific Gravity/API Gravity and BS&W content of
the Crude Oil.
·
Crude
Oil Stock Calculation consists of: Step of Crude Oil Stock Calculation, Reading
of Tank Table, and Reading of ASTM – IP Table.
·
Measurement
and calculation Procedure of crude By Flow Meter consist of: Explanation working system of Flow Meter, Procedure
of proving and calculation the Metering System by Proper Meter.
·
“Lifting Procedure”, “Off take Procedure and
Nomination”.
DURATION
3 days
Comments
Post a Comment